NPSH Calculation Spreadsheet – Trial

$0.00

Download NPSH Calculation Spreadsheet

This is a NPSH Calculation Excel Spreadsheet developed by a professional engineer and experienced pump expert for centrifugal pump calculation and selection. Click above button to download. It is free of charge. No email address is required. NPSH available calculation is very important for pump selection in order to prevent pump from cavitation and damage. If you don’t have enough time to perform the calculation, our pump expert can help you with the calculation. Please select a required timeline below. If you have any question please contact us.

Use Our NPSH Calculation & Pump Sizing Service

Description

Why Use Our NPSH Calculation & Pump Sizing Service

With 20+ years centrifugal pump sizing and NPSH calculation experience we can help you calculate pump NPSH available correctly and accurately. We understand how centrifugal pump works and more importantly, why a centrifugal pump doesn’t work. It is guaranteed that pump cavitation is eliminated by using our NPSH and pump design data. If you have any questions, please contact us.  

NPSH Calculation Spreadsheet

This is a trial version of the NPSH calculation spreadsheet.  There is also other versions of the NPSH calculation and pump sizing spreadsheet available as detailed in below table. Please select the spreadsheet suitable to your application. Simply click on the button below to get the spreadsheet you need.
 
                                          GET BASIC   GET SATNDARD    EXPERT HELP   GET DEVELOPER

 

Profile of OilGas Engineer

SUMMARY

  • Twenty-Seven (27) years of experience in oil & gas /refinery /petrochemical process/project design, technical service, research and process development, pilot testing and scale-up, project management.
  • Worked on units such as LNG production, natural gas amine desulfurization, TEG & molecular sieve dehydration, cryogenic gas plant, gas and oil gathering/ separation, LPG/NGL recovery, Clause sulfur recovery, helium separation, flare and blowdown system, tank farm, utility units, bitumen SAGD, crude and vacuum fractionation, fluid catalytic cracking, propylene oxide, propylene glycol, polyether polyol, CNG, etc.
  • Work scope included process selection, optimization, conceptual design, feasibility study, front-end design, detailed design, commissioning and start-up. New and revamp projects onshore and offshore. Involved in cost estimate in various project stages.
  • proficient in process simulation, evaluation, heat & material balance, PFD and P&ID, system design, pipe sizing, equipment sizing and selection, flare system and PSV sizing, emission control, Line Designation Table, mechanical & instrumentation specification, safety review, PHA/HAZOP & SIL analysis, cause & effect diagram.
  • Familiar with API and ASME codes, Shell, Exxon Mobil, BP standards and engineering practice.

EXPERIENCE

2008-2009  Process Engineer – KBR, Inc. Houston, USA
2005-2008 Senior Process Engineer – WorleyParsons, Calgary, Canada
2001-2005 Lead Process Engineer – Colt Engineering Corp, Sarnia, Canada

Registrations/Affiliations

Licensed Professional Engineer, Alberta, Canada
Licensed Professional Engineer, Ontario, Canada

Specific Technical Expertise/Specialist Courses

Advanced level in Petro-SIM, Hysys, Aspen, PRO-II, Amsim, Sulsim, Visualflow, Flarenet, Dynsim, HTRI, TASC, ACOL, Pipeflo.

Disclaimer

This spreadsheet is a tool to help the calculation only. The author of this spreadsheet  make no representation or warranties of any kind, express or implied about the completeness, accuracy, reliability or availability with the calculation results and information. Any reliance you place on this calculation is therefore strictly at you own risk.

Reviews

There are no reviews yet.

Be the first to review “NPSH Calculation Spreadsheet – Trial”